Published
30 November 2011 | By Energy Exemplar
Analysis presented in this paper was done by two different models: mathematical model, based on short run marginal costs (SRMC, relevant for fuel switch in existing power plant and merit order change) and long run marginal costs (LRMC, relevant for new investment decisions); and electricity market simulation model PLEXOS, which was used for modelling Croatian power system during development of the Croatian Energy Strategy in 2008.